Sprint 70 Plan: Autonomous Improvement Loop (Guardrailed)

Context

With full telemetry, benchmarks, and governance in place, Sprint 70 introduces a guardrailed autonomous improvement loop for adapter quality.


Goals

  1. Propose adapter/policy improvements from observed failures
  2. Validate proposals in sandboxed benchmark cycles
  3. Require explicit promotion approval for production adoption
  4. Track improvement ROI and rollback health

Steps

Step 930: Sandbox trial runner for proposals (10 tests)

Step 931: Trial evaluation rubric (quality/risk/cost) (10 tests)

Step 932: Promotion gate for accepted proposals (10 tests)

Step 933: Auto-rollback trigger design for degraded proposals (10 tests)

Step 934: Improvement ROI tracker (8 tests)

Step 935: whetstone_propose_adapter_improvements MCP tool (8 tests)

Step 936: whetstone_run_improvement_trial MCP tool (8 tests)

Step 937: Continuous improvement program summary artifact (8 tests)

Step 938: Sprint 70 integration summary + regression (8 tests)


Safety Rule

  • Autonomous changes cannot bypass human approval into Stable-tier pathways.