# Sprint 70 Plan: Autonomous Improvement Loop (Guardrailed) ## Context With full telemetry, benchmarks, and governance in place, Sprint 70 introduces a guardrailed autonomous improvement loop for adapter quality. --- ## Goals 1. Propose adapter/policy improvements from observed failures 2. Validate proposals in sandboxed benchmark cycles 3. Require explicit promotion approval for production adoption 4. Track improvement ROI and rollback health --- ## Steps ### Step 929: Improvement proposal generator from failure trends (12 tests) ### Step 930: Sandbox trial runner for proposals (10 tests) ### Step 931: Trial evaluation rubric (quality/risk/cost) (10 tests) ### Step 932: Promotion gate for accepted proposals (10 tests) ### Step 933: Auto-rollback trigger design for degraded proposals (10 tests) ### Step 934: Improvement ROI tracker (8 tests) ### Step 935: `whetstone_propose_adapter_improvements` MCP tool (8 tests) ### Step 936: `whetstone_run_improvement_trial` MCP tool (8 tests) ### Step 937: Continuous improvement program summary artifact (8 tests) ### Step 938: Sprint 70 integration summary + regression (8 tests) --- ## Safety Rule - Autonomous changes cannot bypass human approval into Stable-tier pathways.