1.2 KiB
1.2 KiB
Sprint 70 Plan: Autonomous Improvement Loop (Guardrailed)
Context
With full telemetry, benchmarks, and governance in place, Sprint 70 introduces a guardrailed autonomous improvement loop for adapter quality.
Goals
- Propose adapter/policy improvements from observed failures
- Validate proposals in sandboxed benchmark cycles
- Require explicit promotion approval for production adoption
- Track improvement ROI and rollback health
Steps
Step 929: Improvement proposal generator from failure trends (12 tests)
Step 930: Sandbox trial runner for proposals (10 tests)
Step 931: Trial evaluation rubric (quality/risk/cost) (10 tests)
Step 932: Promotion gate for accepted proposals (10 tests)
Step 933: Auto-rollback trigger design for degraded proposals (10 tests)
Step 934: Improvement ROI tracker (8 tests)
Step 935: whetstone_propose_adapter_improvements MCP tool (8 tests)
Step 936: whetstone_run_improvement_trial MCP tool (8 tests)
Step 937: Continuous improvement program summary artifact (8 tests)
Step 938: Sprint 70 integration summary + regression (8 tests)
Safety Rule
- Autonomous changes cannot bypass human approval into Stable-tier pathways.