Files
whetstone_DSL/sprint194_plan.md

1022 B

Sprint 194 Plan: Complex Class Generation Reliability I

Context

Direct generator path remains weak for complex multi-method class output.

Goals

  1. Add class-level generation contract for multi-method targets
  2. Emit class skeleton + method body completion plan
  3. Add deterministic class acceptance checks

Steps

Step 2009: Class-generation contract schema (10 tests)

Define required fields for class-level code generation.

Step 2010: Multi-method class skeleton emitter (10 tests)

Generate deterministic class skeletons with method stubs.

Step 2011: Method completion planner (8 tests)

Emit ordered method completion plan with dependencies.

Step 2012: Class-level acceptance command binding (8 tests)

Bind deterministic build/test commands to class generation tasks.

Step 2013: Sprint 194 Integration Summary (8 tests)

Add editor/src/Sprint194IntegrationSummary.h.

Architecture Gate

  • Complex class targets must produce structured class outputs, not single-function fallbacks.