Sprint 134 Plan: End-to-End MCP Reachability and Routing Integrity

Context

Tools can be registered but still unreachable due to routing or context issues. Sprint 134 verifies deterministic end-to-end MCP tool reachability.


Goals

  1. Model full request path from client call to handler execution
  2. Validate reachability for all registered tools
  3. Detect routing dead-ends and shadowed handlers
  4. Export deterministic reachability diagnostics

Steps

Step 1579: MCP request-route graph model (10 tests)

Step 1580: Handler binding integrity checker (10 tests)

Step 1581: Tool reachability runner with deterministic probes (10 tests)

Step 1582: Shadowed/duplicate handler detector model (10 tests)

Step 1583: whetstone_probe_tool_reachability MCP tool (8 tests)

Step 1584: whetstone_get_route_integrity MCP tool (8 tests)

Step 1585: Route integrity gate bindings (8 tests)

Step 1586: Reachability exception ledger model (8 tests)

Step 1587: Route integrity report artifact (8 tests)

Step 1588: Sprint 134 integration summary + regression (8 tests)


Architecture Gate

  • Reachability probes must be deterministic and replayable
  • Duplicate/shadow detection must include explicit route evidence
  • Route diagnostics must avoid ambiguous free text
  • Max 600 lines per header