Sprint 134 Plan: End-to-End MCP Reachability and Routing Integrity
Context
Tools can be registered but still unreachable due to routing or context issues. Sprint 134 verifies deterministic end-to-end MCP tool reachability.
Goals
- Model full request path from client call to handler execution
- Validate reachability for all registered tools
- Detect routing dead-ends and shadowed handlers
- Export deterministic reachability diagnostics
Steps
Step 1579: MCP request-route graph model (10 tests)
Step 1580: Handler binding integrity checker (10 tests)
Step 1581: Tool reachability runner with deterministic probes (10 tests)
Step 1582: Shadowed/duplicate handler detector model (10 tests)
Step 1583: whetstone_probe_tool_reachability MCP tool (8 tests)
Step 1584: whetstone_get_route_integrity MCP tool (8 tests)
Step 1585: Route integrity gate bindings (8 tests)
Step 1586: Reachability exception ledger model (8 tests)
Step 1587: Route integrity report artifact (8 tests)
Step 1588: Sprint 134 integration summary + regression (8 tests)
Architecture Gate
- Reachability probes must be deterministic and replayable
- Duplicate/shadow detection must include explicit route evidence
- Route diagnostics must avoid ambiguous free text
- Max 600 lines per header