1.8 KiB
1.8 KiB
Whetstone DSL — Current State
Date: 2026-03-06
Purpose: Today-state snapshot after validating handoff notes, sprint artifacts, and gap registry.
Verified Today
- Latest prior handoff file is
HANDOFF-2026-03-02-sprint286.md(states last step1962, next step1963). - Codebase contains Phase 6 artifacts through Sprint 290:
editor/src/Sprint287IntegrationSummary.heditor/src/Sprint288IntegrationSummary.heditor/src/Sprint289IntegrationSummary.heditor/src/Sprint290IntegrationSummary.heditor/tests/step1963_test.cppthrougheditor/tests/step1982_test.cppeditor/CMakeLists.txtincludes targets throughstep1982_test.
Build/Test Validation Run (2026-03-06)
Built and executed:
step1967_test(Sprint 287 integration) — 5/5 passstep1977_test(Sprint 289 integration) — 5/5 passstep1982_test(Sprint 290 integration) — 5/5 pass
Sprint Status (Current)
- Highest verified step:
1982 - Highest verified sprint: Sprint 290
- Interpretation: Sprints 287–290 are implemented in this workspace and pass their integration tests.
Gap Registry Status (Current)
Source: docs/generator_readiness_gap_registry_2026-02-26.md
- Registry entries
GR-001throughGR-026are all markeddone. - No rows are marked
openorpartial. - Registry header still says Last reviewed: 2026-02-28.
- Per registry freshness protocol (revalidate after 3+ days), this status is stale by date and should be formally re-reviewed/updated.
Practical Summary
- Engineering state: Phase 6 appears complete through Sprint 290 in code/tests.
- Documentation state: Handoff trail is behind actual implementation; gap registry conclusions may still be true but need a dated review refresh.