Files
whetstone_DSL/HANDOFF-2026-03-06-current-state.md

1.8 KiB
Raw Blame History

Whetstone DSL — Current State

Date: 2026-03-06
Purpose: Today-state snapshot after validating handoff notes, sprint artifacts, and gap registry.

Verified Today

  • Latest prior handoff file is HANDOFF-2026-03-02-sprint286.md (states last step 1962, next step 1963).
  • Codebase contains Phase 6 artifacts through Sprint 290:
    • editor/src/Sprint287IntegrationSummary.h
    • editor/src/Sprint288IntegrationSummary.h
    • editor/src/Sprint289IntegrationSummary.h
    • editor/src/Sprint290IntegrationSummary.h
    • editor/tests/step1963_test.cpp through editor/tests/step1982_test.cpp
    • editor/CMakeLists.txt includes targets through step1982_test.

Build/Test Validation Run (2026-03-06)

Built and executed:

  • step1967_test (Sprint 287 integration) — 5/5 pass
  • step1977_test (Sprint 289 integration) — 5/5 pass
  • step1982_test (Sprint 290 integration) — 5/5 pass

Sprint Status (Current)

  • Highest verified step: 1982
  • Highest verified sprint: Sprint 290
  • Interpretation: Sprints 287290 are implemented in this workspace and pass their integration tests.

Gap Registry Status (Current)

Source: docs/generator_readiness_gap_registry_2026-02-26.md

  • Registry entries GR-001 through GR-026 are all marked done.
  • No rows are marked open or partial.
  • Registry header still says Last reviewed: 2026-02-28.
  • Per registry freshness protocol (revalidate after 3+ days), this status is stale by date and should be formally re-reviewed/updated.

Practical Summary

  • Engineering state: Phase 6 appears complete through Sprint 290 in code/tests.
  • Documentation state: Handoff trail is behind actual implementation; gap registry conclusions may still be true but need a dated review refresh.