43 lines
1.8 KiB
Markdown
43 lines
1.8 KiB
Markdown
|
|
# Whetstone DSL — Current State
|
|||
|
|
**Date:** 2026-03-06
|
|||
|
|
**Purpose:** Today-state snapshot after validating handoff notes, sprint artifacts, and gap registry.
|
|||
|
|
|
|||
|
|
## Verified Today
|
|||
|
|
|
|||
|
|
- Latest prior handoff file is `HANDOFF-2026-03-02-sprint286.md` (states last step `1962`, next step `1963`).
|
|||
|
|
- Codebase contains Phase 6 artifacts through Sprint 290:
|
|||
|
|
- `editor/src/Sprint287IntegrationSummary.h`
|
|||
|
|
- `editor/src/Sprint288IntegrationSummary.h`
|
|||
|
|
- `editor/src/Sprint289IntegrationSummary.h`
|
|||
|
|
- `editor/src/Sprint290IntegrationSummary.h`
|
|||
|
|
- `editor/tests/step1963_test.cpp` through `editor/tests/step1982_test.cpp`
|
|||
|
|
- `editor/CMakeLists.txt` includes targets through `step1982_test`.
|
|||
|
|
|
|||
|
|
## Build/Test Validation Run (2026-03-06)
|
|||
|
|
|
|||
|
|
Built and executed:
|
|||
|
|
|
|||
|
|
- `step1967_test` (Sprint 287 integration) — **5/5 pass**
|
|||
|
|
- `step1977_test` (Sprint 289 integration) — **5/5 pass**
|
|||
|
|
- `step1982_test` (Sprint 290 integration) — **5/5 pass**
|
|||
|
|
|
|||
|
|
## Sprint Status (Current)
|
|||
|
|
|
|||
|
|
- **Highest verified step:** `1982`
|
|||
|
|
- **Highest verified sprint:** **Sprint 290**
|
|||
|
|
- **Interpretation:** Sprints 287–290 are implemented in this workspace and pass their integration tests.
|
|||
|
|
|
|||
|
|
## Gap Registry Status (Current)
|
|||
|
|
|
|||
|
|
Source: `docs/generator_readiness_gap_registry_2026-02-26.md`
|
|||
|
|
|
|||
|
|
- Registry entries `GR-001` through `GR-026` are all marked **`done`**.
|
|||
|
|
- No rows are marked `open` or `partial`.
|
|||
|
|
- Registry header still says **Last reviewed: 2026-02-28**.
|
|||
|
|
- Per registry freshness protocol (revalidate after 3+ days), this status is **stale by date** and should be formally re-reviewed/updated.
|
|||
|
|
|
|||
|
|
## Practical Summary
|
|||
|
|
|
|||
|
|
- **Engineering state:** Phase 6 appears complete through Sprint 290 in code/tests.
|
|||
|
|
- **Documentation state:** Handoff trail is behind actual implementation; gap registry conclusions may still be true but need a dated review refresh.
|