# Progress Log - 2026-02-26
|
|
|
|
## Scope Covered Today
|
|
|
|
- Sprint tranche execution and validation from `206` through `227`.
|
|
- Hard benchmark reruns on:
|
|
- `challenging_subset_prod_2026-02-26.jsonl`
|
|
- `challenging_fullstack_multifile_2026-02-26.jsonl`
|
|
- Production-loop anti-false-green hardening, projection/fullstack contract enforcement, parity gating, and parity remediation.
|
|
|
|
## Key Outcomes
|
|
|
|
1. Sprints `206-211`:
|
|
- Added anti-false-green production evidence gating.
|
|
- Added projection-contract validation and parity/efficiency/intent consistency analyzers.
|
|
- Status: `PARTIAL` (diagnostics/enforcement improved, parity and readiness still weak at that stage).
|
|
|
|
2. Sprints `217-221`:
|
|
- Implemented multi-file/fullstack contract gates (migration/security/SLO/rollout checks).
|
|
- Added fullstack closure analyzer and execution tracker.
|
|
- Status: `IMPLEMENTED`, then `PARTIAL` until parity inconsistency was addressed.
|
|
|
|
3. Sprints `222-224`:
|
|
- Added strict AB/production parity hard gate and summary metrics.
|
|
- Eliminated unresolved divergence by blocking inconsistent runs.
|
|
- Status: `DONE` (for gating/reporting behavior).
|
|
|
|
4. Sprints `225-227`:
|
|
- Added deterministic path-B repair layer:
|
|
- C++ include repair for `std::vector`.
|
|
- Go/Rust queue transpile skeleton normalization.
|
|
- Integrated repair into AB path-B flow.
|
|
- Fixed Rust gate harness initialization issue.
|
|
- Validation result on latest reruns:
|
|
- `challenging_subset_prod_20260226_r7`: `ab_prod_divergence_count=0`, `ab_consistency_blocked_count=0`
|
|
- `challenging_fullstack_multifile_20260226_r7`: `ab_prod_divergence_count=0`, `ab_consistency_blocked_count=0`
|
|
- Status: `DONE`.
|
|
|
|
## Canonical Execution Trackers
|
|
|
|
- `docs/sprint206_211_execution_tracker_2026-02-26.md`
|
|
- `docs/sprint217_221_execution_tracker_2026-02-26.md`
|
|
- `docs/sprint222_224_execution_tracker_2026-02-26.md`
|
|
- `docs/sprint225_227_execution_tracker_2026-02-26.md`
|
|
|
|
## Canonical Gap Registry
|
|
|
|
- `docs/generator_readiness_gap_registry_2026-02-26.md`
|
|
|
|
## Remaining Risk (Important)
|
|
|
|
- Current path-B repair closure is pattern-driven around recurring queue-shaped transpile failures.
|
|
- Next required tranche: broaden to non-queue semantics and first-class spec-to-execution-ready planning.
|