930 B
930 B
Sprint 199 Plan: Long-Range Edit Reliability IV (Benchmarks)
Context
Reliability claims need dedicated benchmark evidence.
Goals
- Add long-range benchmark corpus
- Measure success, rollback, and drift rates
- Gate promotion on benchmark thresholds
Steps
Step 2034: Long-range benchmark corpus setup (10 tests)
Create fixtures for multi-module and cross-file transformations.
Step 2035: Benchmark runner and metrics export (10 tests)
Emit success/rollback/drift metrics per benchmark.
Step 2036: Reliability threshold gate (8 tests)
Block promotion when benchmark thresholds fail.
Step 2037: Benchmark trend regression detector (8 tests)
Detect reliability regressions against baseline runs.
Step 2038: Sprint 199 Integration Summary (8 tests)
Add editor/src/Sprint199IntegrationSummary.h.
Architecture Gate
- Promotion requires passing long-range reliability benchmark thresholds.