Sprint 242 Execution Tracker - 2026-02-26

Scope

  • sprint242_plan.md

Implemented

Pipeline enhancement in tools/mcp/run_sprint_taskitem_pipeline.sh:

  • Added WSTONE_EXTRA_NORMALIZED_REQUIREMENTS_FILE input.
  • Validates file exists and contains JSON array.
  • Appends extra requirements into NORMALIZED_REQS before generation.
  • Summary now includes extra_normalized_requirements.

New remediation tooling:

  • tools/mcp/synthesize_native_impact_remediation_requirements.py
    • Converts failing profile checks into deterministic constraint requirements.
  • tools/mcp/run_native_impact_remediation_loop.sh
    • Runs baseline coverage pass.
    • Synthesizes extra requirements from failing checks.
    • Reruns pipeline with injected requirements.
    • Emits before/after delta summary.

Baseline Loop Artifact

  • logs/taskitem_runs/TEST_ONLY_sprint242_impact_remediation_loop_20260226/remediation_loop_summary.json
  • logs/taskitem_runs/TEST_ONLY_sprint242_impact_remediation_loop_20260226/extra_normalized_requirements.json

Observed result on fullstack sample:

  • before: failing_profile_count=7
  • after: failing_profile_count=7
  • delta: 0 (remediation wiring is operational; generator capability uplift still required)

Explicit Completion Signal

  • Sprint 242: DONE (implemented + end-to-end remediation loop verified)