Sprint 88 Plan: Long-Horizon Drift Monitoring and Forecasting

Context

Language ecosystems evolve. Sprint 88 predicts and mitigates future drift risks before they degrade support tiers.


Goals

  1. Monitor ecosystem/version drift risk across languages and runtimes
  2. Forecast likely pair instability and maintenance demand
  3. Preemptively schedule mitigation work
  4. Protect LTS matrix from unplanned degradations

Steps

Step 1109: Ecosystem drift signal model (12 tests)

Step 1110: Pair stability forecasting engine (10 tests)

Step 1111: Maintenance demand estimator (10 tests)

Step 1112: Preventive mitigation planner (10 tests)

Step 1113: Forecast confidence and uncertainty model (10 tests)

Step 1114: Drift-triggered scheduling integration (8 tests)

Step 1115: whetstone_get_pair_stability_forecast MCP tool (8 tests)

Step 1116: whetstone_plan_preventive_maintenance MCP tool (8 tests)

Step 1117: Drift outlook report artifact (8 tests)

Step 1118: Sprint 88 integration summary + regression (8 tests)


Forecast Rule

  • High-risk forecasted pairs are prioritized ahead of elective expansions.