Sprint 206 Plan: Anti-False-Green Production Gating
Context
Hard benchmark subset showed production-loop green outcomes where A/B paths reported compile/test failures.
Goals
- Require explicit compile/test evidence for production green status
- Reject green status when gate evidence payload is missing/null
- Emit deterministic false-green diagnostics
Steps
Step 2069: Production evidence completeness gate (10 tests)
Require non-null gate evaluation and evidence packet fields before green.
Step 2070: Compile/test proof binding (10 tests)
Bind green status to successful compile/test proof records.
Step 2071: False-green diagnostic class (8 tests)
Emit deterministic false_green_detected blocked reason.
Step 2072: Production summary hardening (8 tests)
Add explicit evidence_complete and gate_proofs fields.
Step 2073: Sprint 206 Integration Summary (8 tests)
Add editor/src/Sprint206IntegrationSummary.h.
Architecture Gate
- Production loop cannot report
overall_ready=truewithout compile/test evidence packets.