3.4 KiB
3.4 KiB
Deterministic Gap Hunt Report - 2026-02-26
1) Strict Backfill Audit of Sprints 186-205
Reference:
docs/sprint186_205_intent_audit_2026-02-26.mddocs/sprint186_205_closeout_report_2026-02-26.md
Signal split:
- Pipeline closeout (
EXECUTION-READY):20/20 - Strict intent closure:
CLOSED:1/20PARTIAL:10/20GAP:9/20
Interpretation:
- Operational gates are green.
- Many original sprint intents remain partially implemented or scaffolded.
2) New Semantically Challenging Project Catalogs
Created:
datasets/project_benchmarks/challenging_deterministic_projects_2026-02-26.jsonl(12 hard projects)datasets/project_benchmarks/challenging_subset_prod_2026-02-26.jsonl(focused production-loop subset)datasets/project_benchmarks/challenging_projection_projects_2026-02-26.jsonl(projection/environment constraints)docs/challenging_deterministic_projects_2026-02-26.md
3) Benchmark Results and New Gap Signals
A) Hard matrix (12 projects x 4 languages)
Run:
logs/taskitem_runs/challenging_matrix_20260226
Summary highlights:
total_runs=48- A/B Path A ready:
77.08% - A/B Path B ready:
25.0% - Path B top failures:
compile_failed:non_zero_exit,tests_failed:non_zero_exit(36 each) - Avg token ratio
PathB/PathA:13.67x
B) Focused production subset
Run:
logs/taskitem_runs/challenging_subset_prod_20260226
Summary highlights:
total_runs=8- A/B path B still fails on cpp cases.
- Production loop reports
ready=100%for all 8 cases, including cases where A/B path B failed compile/tests. - Several production summaries show sparse/null gate evidence fields despite green outcome.
C) Projection constraints subset
Run:
logs/taskitem_runs/challenging_projection_matrix_20260226
Summary highlights:
- Projection-heavy specs are accepted as free-text, but constraint fields are not enforced as first-class contract inputs in benchmark orchestration.
- Confirms projection/environment constraints are under-modeled in current automated benchmark loop.
4) New Gap IDs (Post-186-205)
-
GR-011False-green production gating- Symptom: production loop marks ready where A/B compilation/tests fail on equivalent hard specs.
- Evidence:
challenging_subset_prod_20260226vs A/B failures.
-
GR-012Projection constraint contract missing in benchmark/execution path- Symptom: target/environment budgets and forbidden APIs are not treated as first-class executable constraints.
- Evidence: projection catalog accepted, but orchestration path consumes mostly
spectext.
-
GR-013Language asymmetry under hard semantics- Symptom: Python passes much more frequently than cpp/go/rust on equivalent hard specs.
- Evidence:
challenging_matrix_20260226language breakdown.
-
GR-014Token inefficiency and semantic collapse in language-first path- Symptom: Path B token use is ~14x higher with poor readiness under hard tasks.
- Evidence: hard matrix summaries.
-
GR-015Intent-vs-closeout drift risk- Symptom: sprint closeout can be green while original intent remains partial.
- Evidence: strict intent audit vs closeout report divergence.
5) Recommended Next Sprint Theme
- Hard-gate production readiness on explicit compile/test evidence.
- Add projection-constraint schema to benchmark and pipeline tool inputs.
- Add cross-language parity gates for hard semantic specs.
- Add anti-false-green checks linking A/B and production evidence packets.