Files
whetstone_DSL/docs/sprint262_execution_tracker_2026-02-26.md

1.3 KiB

Sprint 262 Execution Tracker - 2026-02-26

Scope

  • sprint262_plan.md

Implemented

New tool:

  • tools/mcp/synthesize_raw_template_control_pack.py
    • Synthesizes output-shape control requirements from top-gap signals:
      • schema-level field requirements
      • explicit JSON template example
      • missing-signal alignment clause

Pipeline integration in tools/mcp/run_sprint_taskitem_pipeline.sh:

  • Added:
    • WSTONE_NATIVE_RAW_TEMPLATE_CONTROL_PACK
    • WSTONE_NATIVE_RAW_TEMPLATE_CONTROL_MAX_SIGNALS
  • Added artifacts:
    • 01g_raw_template_control_pack_requirements.json
    • 01g_raw_template_control_pack_report.json
  • Added summary packet:
    • native_raw_template_control_pack

Validation Artifacts

OFF:

  • logs/taskitem_runs/01a_fallback_intake_spec_20260226_165422/00_summary.json

ON:

  • logs/taskitem_runs/01a_fallback_intake_spec_20260226_165430/00_summary.json
  • template-control artifacts:
    • logs/taskitem_runs/01a_fallback_intake_spec_20260226_165430/01g_raw_template_control_pack_report.json

Observed result on hard sample:

  • template-control pack injected (requirement_count=3, selected_signal_count=8)
  • selected_variant remained 0
  • best_top_gap_score remained 0
  • failing_profile_count remained 1

Explicit Completion Signal

  • Sprint 262: DONE (implemented + validated; intrinsic uplift still pending)