Files
whetstone_DSL/sprint77_plan.md

1.3 KiB

Sprint 77 Plan: SLA Reliability and Incident-Ready Porting Operations

Context

At scale, transpilation is an operational system with uptime/reliability targets. Sprint 77 defines SLAs and incident workflows for porting infrastructure.


Goals

  1. Define and enforce transpilation service SLAs/SLOs
  2. Add reliability signals and alerting for pair regressions
  3. Integrate incident runbooks for gate and certification failures
  4. Improve recovery time with automated containment strategies

Steps

Step 999: Transpilation SLA/SLO schema (availability, latency, quality) (12 tests)

Step 1000: Reliability signal collector integration (10 tests)

Step 1001: Alert policy engine for SLO breaches (10 tests)

Step 1002: Incident classifier for transpilation failures (10 tests)

Step 1003: Auto-containment strategy hooks (10 tests)

Step 1004: Incident runbook bindings and drill tracker integration (8 tests)

Step 1005: whetstone_get_transpilation_slo_status MCP tool (8 tests)

Step 1006: whetstone_trigger_porting_incident_drill MCP tool (8 tests)

Step 1007: Reliability operations report artifact (8 tests)

Step 1008: Sprint 77 integration summary + regression (8 tests)


Reliability Rule

  • Repeated SLO breach for a pair automatically downgrades support tier pending review.