1014 B
1014 B
Sprint 190 Plan: Capability-Gap Executable Handoff II
Context
Sprint 185 starts executable handoff; full end-to-end closure still pending.
Goals
- Emit validation-level executable debug-loop plan
- Keep queue/validation plan fingerprints aligned
- Add plan schema tests
Steps
Step 1989: Validation capability gap call-plan packet (10 tests)
Emit deterministic capability_gap_call_plan at report level.
Step 1990: Queue/validation fingerprint convergence (10 tests)
Guarantee matching fingerprints for identical plan payloads.
Step 1991: Call-plan schema guardrail (8 tests)
Validate call-plan structure before emission.
Step 1992: Remediation routing compatibility checks (8 tests)
Ensure next-action hints and call-plan profiles do not diverge.
Step 1993: Sprint 190 Integration Summary (8 tests)
Add editor/src/Sprint190IntegrationSummary.h.
Architecture Gate
- Capability-gap call plans must be executable and schema-valid in both queue and validation outputs.