Files
whetstone_DSL/sprint138_plan.md

1.4 KiB

Sprint 138 Plan: Distributed Orchestrator-to-MCP Handoff Consistency

Context

As orchestration spreads across nodes, MCP handoffs must preserve deterministic context and tool contracts. Sprint 138 seals handoff consistency.


Goals

  1. Normalize orchestrator-to-MCP handoff packets across nodes
  2. Preserve deterministic context slices and tool arguments
  3. Detect handoff drift between submitter and executor nodes
  4. Export handoff integrity evidence for distributed debugging

Steps

Step 1619: Orchestrator MCP handoff packet schema (10 tests)

Step 1620: Context slice canonicalization for handoffs (10 tests)

Step 1621: Cross-node handoff drift detector model (10 tests)

Step 1622: Distributed handoff replay verifier (10 tests)

Step 1623: whetstone_capture_handoff_packet MCP tool (8 tests)

Step 1624: whetstone_verify_handoff_integrity MCP tool (8 tests)

Step 1625: whetstone_list_handoff_divergences MCP tool (8 tests)

Step 1626: Handoff confidence scorer model (8 tests)

Step 1627: Handoff integrity report artifact (8 tests)

Step 1628: Sprint 138 integration summary + regression (8 tests)


Architecture Gate

  • Handoff packets must be deterministic and replayable
  • Drift reports must be structured with explicit field-level differences
  • Context canonicalization must be stable across nodes
  • Max 600 lines per header