# Progress Log - 2026-02-26 ## Scope Covered Today - Sprint tranche execution and validation from `206` through `227`. - Hard benchmark reruns on: - `challenging_subset_prod_2026-02-26.jsonl` - `challenging_fullstack_multifile_2026-02-26.jsonl` - Production-loop anti-false-green hardening, projection/fullstack contract enforcement, parity gating, and parity remediation. ## Key Outcomes 1. Sprints `206-211`: - Added anti-false-green production evidence gating. - Added projection-contract validation and parity/efficiency/intent consistency analyzers. - Status: `PARTIAL` (diagnostics/enforcement improved, parity and readiness still weak at that stage). 2. Sprints `217-221`: - Implemented multi-file/fullstack contract gates (migration/security/SLO/rollout checks). - Added fullstack closure analyzer and execution tracker. - Status: `IMPLEMENTED`, then `PARTIAL` until parity inconsistency was addressed. 3. Sprints `222-224`: - Added strict AB/production parity hard gate and summary metrics. - Eliminated unresolved divergence by blocking inconsistent runs. - Status: `DONE` (for gating/reporting behavior). 4. Sprints `225-227`: - Added deterministic path-B repair layer: - C++ include repair for `std::vector`. - Go/Rust queue transpile skeleton normalization. - Integrated repair into AB path-B flow. - Fixed Rust gate harness initialization issue. - Validation result on latest reruns: - `challenging_subset_prod_20260226_r7`: `ab_prod_divergence_count=0`, `ab_consistency_blocked_count=0` - `challenging_fullstack_multifile_20260226_r7`: `ab_prod_divergence_count=0`, `ab_consistency_blocked_count=0` - Status: `DONE`. ## Canonical Execution Trackers - `docs/sprint206_211_execution_tracker_2026-02-26.md` - `docs/sprint217_221_execution_tracker_2026-02-26.md` - `docs/sprint222_224_execution_tracker_2026-02-26.md` - `docs/sprint225_227_execution_tracker_2026-02-26.md` ## Canonical Gap Registry - `docs/generator_readiness_gap_registry_2026-02-26.md` ## Remaining Risk (Important) - Current path-B repair closure is pattern-driven around recurring queue-shaped transpile failures. - Next required tranche: broaden to non-queue semantics and first-class spec-to-execution-ready planning. ## Added After Commit `55876d3` (Same Day Continuation) - Wired first-class planning precheck into `tools/mcp/run_sprint_taskitem_pipeline.sh`. - Added environment controls: - `WSTONE_SPEC_READINESS_PRECHECK` - `WSTONE_SPEC_READINESS_HARD_GATE` - `WSTONE_SPEC_READINESS_MIN_SCORE` - Spec readiness is now available in pipeline `00_summary.json` as `planning_readiness`. - Added auto-hardening utility: - `tools/mcp/spec_planning_hardener.py` - Added end-to-end hardening gate wrapper: - `tools/mcp/run_spec_hardening_gate.sh` - Demonstrated hard-gate delta on sprint sample: - original spec blocked (`rc=7`, score `17`) - hardened spec passed (`rc=0`, score `100`) - Executed batch hardening on real corpora: - drive specs (7) - example product meta specs (10) - Batch report: - `docs/spec_hardening_batch_report_2026-02-26.md` - Artifact isolation update: - moved planning/hardening outputs to `logs/taskitem_runs/TEST_ONLY_*` paths. - wrapper default now writes to `TEST_ONLY_spec_hardening_gate_*`. ## Sprint 232 Added (Same Day) - Added semantic planning bridge: - `tools/mcp/markdown_to_semantic_annotations.py` - Integrated into taskitem pipeline: - `tools/mcp/run_sprint_taskitem_pipeline.sh` - env toggle: `WSTONE_SEMANTIC_PLANNING_BRIDGE` (default `1`) - emits `00b_semantic_planning_annotations.json` - summary now includes `semantic_planning_annotations` ## Sprint 233 Added (Same Day) - Added semantic-bridge decomposition tooling: - `tools/mcp/augment_spec_with_semantic_packet.py` - Pipeline now supports: - semantic intake augmentation - semantic requirement injection - semantic task expansion - A/B run shows measurable decomposition delta (TEST_ONLY artifacts): - validation taskitems `2 -> 8` - avg execution specificity `75.0 -> 84.75`