# Sprint 140 Plan: Program-Wide MCP Wiring Closure and Release Gate ## Context With tool-surface, runtime, routing, telemetry, and compatibility controls in place, Sprint 140 establishes a single release gate certifying MCP wiring closure across the program. --- ## Goals 1. Compose all MCP wiring checks into one deterministic closure gate 2. Produce release-ready wiring certification packets 3. Block release on unresolved wiring/runtime/contract drift 4. Provide low-context, machine-readable remediation guidance --- ## Steps ### Step 1639: MCP closure gate aggregate schema (10 tests) ### Step 1640: Multi-check gate orchestrator model (10 tests) ### Step 1641: Wiring closure severity classifier (10 tests) ### Step 1642: Deterministic remediation planner model (10 tests) ### Step 1643: `whetstone_run_mcp_closure_gate` MCP tool (8 tests) ### Step 1644: `whetstone_get_mcp_closure_status` MCP tool (8 tests) ### Step 1645: `whetstone_get_mcp_remediation_plan` MCP tool (8 tests) ### Step 1646: Release certification packet model (8 tests) ### Step 1647: MCP closure publication bundle (8 tests) ### Step 1648: Sprint 140 integration summary + full-program regression (8 tests) --- ## Architecture Gate - Closure gate must be deterministic and reproducible - Any blocking issue must include explicit structured remediation - Certification packets must include provenance and checksums - Max 600 lines per header