Commit Graph

2 Commits

Author SHA1 Message Date
Bill
8cbeef5af4 Steps 284-289: Phase 10e — environment layer, host boundary nodes, MCP env tools (200/200 tests)
Completes Sprint 10. Adds EnvironmentSpec AST node, capability validation
(E0501), annotation compatibility checks (E0502-E0505), env-aware lowering
hints, 3 host boundary AST nodes (HostCall, ScheduleTask, ModuleLoad),
and 4 MCP environment tools. 38 MCP tools total.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-13 05:56:02 +00:00
Bill
ed8618e49f Phase 10e WIP: environment layer core + host boundary nodes
EnvironmentSpec, CapabilityRequirement, HostCall, ScheduleTask, ModuleLoad
classes created. All wired through Serialization.h, CompactAST.h,
SidecarPersistence.h, HeadlessAgentRPCHandler.h (setEnvironment,
getEnvironment, validateEnvironment, getLoweringHints RPCs).
Tests for steps 284-285 written. Steps 286-289 tests remaining.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-12 18:41:16 +00:00