Step 523: add sprint 26 integration summary and closure gate

This commit is contained in:
Bill
2026-02-17 09:06:54 -07:00
parent 55e4516176
commit c6c1d54c2c
4 changed files with 230 additions and 0 deletions

View File

@@ -8489,3 +8489,42 @@ histograms and normalization helpers for rapid alignment.
- `editor/src/CrossPanelConsistencySweep.h` within header-size limit (`81` <= `600`)
- `editor/tests/step522_test.cpp` within test-file size guidance (`152` lines)
- Header-only architecture and naming conventions remain aligned with `ARCHITECTURE.md`
### Step 523: Sprint 26 Integration + Summary
**Status:** PASS (8/8 tests)
Implements the Sprint 26 closure gate by integrating Phase 26a reliability,
visual token + identity systems, control/typography harmonization,
modifier-edge shortcuts, overlay hardening, notification semantics, and
cross-panel consistency into a single summary signal.
**Files added:**
- `editor/src/Sprint26IntegrationSummary.h` - sprint integration summary module:
- aggregates Step 514-522 validation signals
- computes final Sprint 26 pass flag
- emits Sprint completion summary notes
- `editor/tests/step523_test.cpp` - 8 tests covering:
- phase and domain gate pass signals
- final sprint pass synthesis
- completion-note emission
**Files modified:**
- `editor/CMakeLists.txt` - `step523_test` target
**Verification run:**
- `cmake -S editor -B editor/build-native` - PASS
- `cmake --build editor/build-native --target step523_test` - PASS
- `./editor/build-native/step523_test` - PASS (8/8)
- `./editor/build-native/step522_test` - PASS (12/12) regression coverage
**Architecture gate check:**
- `editor/src/Sprint26IntegrationSummary.h` within header-size limit (`90` <= `600`)
- `editor/tests/step523_test.cpp` within test-file size guidance (`92` lines)
- Header-only architecture and naming conventions remain aligned with `ARCHITECTURE.md`
**Sprint 26 totals (509-523):**
- **Steps completed:** 15
- **New tests in this sprint plan:** 172/172 passing
- **Phase 26a (509-514):** 68/68 passing
- **Phase 26b (515-519):** 60/60 passing
- **Phase 26c (520-523):** 44/44 passing