Step 172: bundled theme pack
This commit is contained in:
@@ -519,3 +519,4 @@ Sprint 5 in progress. Step 141 (Emacs daemon with user config) done. Next: Step
|
||||
| 2026-02-10 | Codex | Step 169: Notification/toast system with status bar history, output log rewire, and notification tests. 2/2 tests pass (step169_test, step169_integration_test). file_limits_test 4/4 passes. |
|
||||
| 2026-02-10 | Codex | Step 170: UI event bus with debounced dispatch, editor wiring, and settings/theme events. 2/2 tests pass (step170_test, step170_integration_test). file_limits_test 4/4 passes. |
|
||||
| 2026-02-10 | Codex | Step 171: Theme engine core enhancements (ThemeColor API, user theme dir, hot reload) with tests. 2/2 tests pass (step171_test, step171_integration_test). file_limits_test 4/4 passes. |
|
||||
| 2026-02-10 | Codex | Step 172: Bundled theme pack renamed to Whetstone Dark/Light and Monokai Pro with tests. 2/2 tests pass (step172_test, step172_integration_test). file_limits_test 4/4 passes. |
|
||||
|
||||
Reference in New Issue
Block a user