Step 262: Phase 9d multi-file project integration tests (Phase 9d complete)

End-to-end tests for the full multi-file workflow: open 3 files, switch
buffers, cross-file symbols, import graph, project diagnostics, search,
rename across files, and batch query verification. 8/8 tests passing.
Sprint 9 complete: 212/212 tests across all 4 phases (Steps 245-262).

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
Bill
2026-02-12 00:46:59 +00:00
parent eab979bae3
commit 872ef493d2
3 changed files with 440 additions and 0 deletions

View File

@@ -560,3 +560,30 @@ Variable declarations, VariableReferences, and Parameters.
- Buffers marked as modified after rename for save-tracking
- Search returns kind field (definition/call/reference/parameter) to categorize
- 30 MCP tools total
### Step 262: Phase 9d Multi-File Project Integration Tests
**Status:** PASS (8/8 tests)
End-to-end integration tests exercising the full multi-file project workflow
across 3-file Python projects. Simulates a realistic agent session from
file opening through cross-file analysis, search, rename, and batch queries.
**Files created:**
- `editor/tests/step262_test.cpp` — 8 integration test cases:
1. Open 3 files, listBuffers shows all with correct state
2. setActiveBuffer switches context, getAST returns correct module
3. Cross-file symbol resolution (crossFile=true includes other buffers' exports)
4. Import graph tracks which files import which (main.py→utils+math_ops)
5. Project-wide diagnostics: undefined import raises cross-file E0400
6. searchProject finds symbol across 3 files (definition + call kinds)
7. renameSymbol: preview then apply across 3 files, verified both directions
8. Full workflow: open→batch(diagnostics+search+buffers)→rename→batch verify
**Files modified:**
- `editor/CMakeLists.txt` — step262_test target
**Key results:**
- Phase 9d complete: all 5 steps pass (56/56 tests across steps 258262)
- Full multi-file project workflow validated end-to-end
- 30 MCP tools, cross-file symbols, import graph, project diagnostics, search, rename
- Sprint 9 complete: all 4 phases pass (212/212 tests across steps 245262)