Step 262: Phase 9d multi-file project integration tests (Phase 9d complete)
End-to-end tests for the full multi-file workflow: open 3 files, switch buffers, cross-file symbols, import graph, project diagnostics, search, rename across files, and batch query verification. 8/8 tests passing. Sprint 9 complete: 212/212 tests across all 4 phases (Steps 245-262). Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
27
progress.md
27
progress.md
@@ -560,3 +560,30 @@ Variable declarations, VariableReferences, and Parameters.
|
||||
- Buffers marked as modified after rename for save-tracking
|
||||
- Search returns kind field (definition/call/reference/parameter) to categorize
|
||||
- 30 MCP tools total
|
||||
|
||||
### Step 262: Phase 9d Multi-File Project Integration Tests
|
||||
**Status:** PASS (8/8 tests)
|
||||
|
||||
End-to-end integration tests exercising the full multi-file project workflow
|
||||
across 3-file Python projects. Simulates a realistic agent session from
|
||||
file opening through cross-file analysis, search, rename, and batch queries.
|
||||
|
||||
**Files created:**
|
||||
- `editor/tests/step262_test.cpp` — 8 integration test cases:
|
||||
1. Open 3 files, listBuffers shows all with correct state
|
||||
2. setActiveBuffer switches context, getAST returns correct module
|
||||
3. Cross-file symbol resolution (crossFile=true includes other buffers' exports)
|
||||
4. Import graph tracks which files import which (main.py→utils+math_ops)
|
||||
5. Project-wide diagnostics: undefined import raises cross-file E0400
|
||||
6. searchProject finds symbol across 3 files (definition + call kinds)
|
||||
7. renameSymbol: preview then apply across 3 files, verified both directions
|
||||
8. Full workflow: open→batch(diagnostics+search+buffers)→rename→batch verify
|
||||
|
||||
**Files modified:**
|
||||
- `editor/CMakeLists.txt` — step262_test target
|
||||
|
||||
**Key results:**
|
||||
- Phase 9d complete: all 5 steps pass (56/56 tests across steps 258–262)
|
||||
- Full multi-file project workflow validated end-to-end
|
||||
- 30 MCP tools, cross-file symbols, import graph, project diagnostics, search, rename
|
||||
- Sprint 9 complete: all 4 phases pass (212/212 tests across steps 245–262)
|
||||
|
||||
Reference in New Issue
Block a user