Add semantic fallback gap audit and budget gate (sprints 236-237)

This commit is contained in:
Bill
2026-02-26 14:53:07 -07:00
parent 3de32bc3d1
commit 7b33aeb24b
12 changed files with 419 additions and 1 deletions

View File

@@ -150,8 +150,13 @@ Parallel planning tranche (active):
- `logs/taskitem_runs/TEST_ONLY_spec_planning_baseline_20260226/deterministic_spec_readiness.json`
Planning runtime controls (active):
- `sprint232_plan.md` to `sprint235_plan.md`
- `sprint232_plan.md` to `sprint237_plan.md`
- semantic bridge + intake augmentation + requirement injection + expansion gating are wired into:
- `tools/mcp/run_sprint_taskitem_pipeline.sh`
- current policy default is native-first semantic fallback:
- `WSTONE_SEMANTIC_TASK_EXPANSION_MODE=fallback_only`
- fallback diagnostics + remediation metadata are emitted by:
- `tools/mcp/analyze_semantic_fallback_gaps.py`
- fallback budget gating is available via:
- `tools/mcp/check_semantic_fallback_budget.py`
- `tools/mcp/run_semantic_fallback_budget_gate.sh`

View File

@@ -46,6 +46,7 @@ This is the canonical dated registry for "not production-ready" generator gaps.
| GR-017 | Full-stack contract propagation gap | `docs/gap_hunt_fullstack_multifile_2026-02-26.md`, `logs/taskitem_runs/challenging_fullstack_multifile_20260226_r5/fullstack_contract_closure.json` | `partial` | Full-stack contract packet + strict validation added in benchmark orchestration and summary aggregation. Contract invalid rate is `0%` on valid catalog, but cross-layer semantic consistency is not yet equivalence-verified. | Semantic propagation verifier sprint |
| GR-018 | Performance/security/rollout constrained refactor enforcement gap | `docs/gap_hunt_fullstack_multifile_2026-02-26.md`, `logs/taskitem_runs/challenging_fullstack_multifile_20260226_r5/results.jsonl` | `partial` | Hard checks now enforce migration rollback + data-loss policy, security deny-by-default, SLO p95 presence, and rollout staged+abort policy. Enforcement is contract-level; generator capability under these constraints is still weak in C++ AB path. | Constraint-aware generation follow-up |
| GR-019 | Parity-blocked readiness load (gating without capability closure) | `logs/taskitem_runs/challenging_fullstack_multifile_20260226_r7/summary.json`, `logs/taskitem_runs/challenging_subset_prod_20260226_r7/summary.json`, `docs/sprint225_227_execution_tracker_2026-02-26.md` | `partial` | Sprint 225-227 reduced blocked parity load from `6` to `0` on both tracked hard catalogs while keeping unresolved divergence at `0`. This closes immediate safety debt for current corpora, but robustness is still contingent on pattern-driven repair classes. | Generalize repairs beyond queue-shaped transpile outputs |
| GR-020 | Semantic fallback overuse masks weak native decomposition | `logs/taskitem_runs/TEST_ONLY_sprint236_semantic_fallback_audit_20260226/semantic_fallback_summary.json`, `logs/taskitem_runs/TEST_ONLY_sprint237_semantic_fallback_gate_fail_20260226/semantic_fallback_budget_gate.json`, `docs/sprint236_execution_tracker_2026-02-26.md`, `docs/sprint237_execution_tracker_2026-02-26.md` | `partial` | Sprint 236 added deterministic fallback-gap auditing with tool + constraint metadata. Sprint 237 added fallback-budget hard gate (`max-fallback-rate`) and produced expected fail/pass artifacts. Current measured slice remains `fallback_rate=1.0`, so gating now detects but does not yet fix root capability gaps. | Native decomposition upgrade + semantic rationale enforcement |
## What Was Covered Today (Sprints 175-184)

View File

@@ -123,3 +123,27 @@
- `logs/taskitem_runs/TEST_ONLY_sprint235_probe_20260226_144846/00_summary.json`
- `logs/taskitem_runs/TEST_ONLY_sprint235_probe_20260226_144854/00_summary.json`
- `logs/taskitem_runs/TEST_ONLY_sprint235_richspec_20260226_144902/00_summary.json`
## Sprint 236 Added (Same Day)
- Added semantic fallback gap audit tool:
- `tools/mcp/analyze_semantic_fallback_gaps.py`
- Emits per-run metadata for remediation routing:
- `recommended_tools`
- `recommended_taskitem_constraints`
- Generated dated audit bundle:
- `logs/taskitem_runs/TEST_ONLY_sprint236_semantic_fallback_audit_20260226/semantic_fallback_summary.json`
- `logs/taskitem_runs/TEST_ONLY_sprint236_semantic_fallback_audit_20260226/semantic_fallback_tooling_recommendations.json`
- Current measured signal on sprint 235 sample runs:
- `fallback_rate=1.0`
- dominant root cause: `native_decomposition_and_semantic_signal_deficit`
## Sprint 237 Added (Same Day)
- Added semantic fallback budget gate:
- `tools/mcp/check_semantic_fallback_budget.py`
- Added single-command audit+gate wrapper:
- `tools/mcp/run_semantic_fallback_budget_gate.sh`
- Dated pass/fail artifacts captured:
- fail (strict budget): `logs/taskitem_runs/TEST_ONLY_sprint237_semantic_fallback_gate_fail_20260226/semantic_fallback_budget_gate.json`
- pass (relaxed budget): `logs/taskitem_runs/TEST_ONLY_sprint237_semantic_fallback_gate_pass_20260226/semantic_fallback_budget_gate.json`

View File

@@ -0,0 +1,34 @@
# Sprint 236 Execution Tracker - 2026-02-26
## Scope
- `sprint236_plan.md`
## Implemented
- Added semantic fallback audit tool:
- `tools/mcp/analyze_semantic_fallback_gaps.py`
- Analyzer outputs:
- `semantic_fallback_records.jsonl`
- `semantic_fallback_summary.json`
- `semantic_fallback_tooling_recommendations.json`
- Added deterministic root-cause classes:
- `native_decomposition_too_shallow`
- `semantic_rationale_missing`
- `native_decomposition_and_semantic_signal_deficit`
- Added per-run remediation metadata:
- `recommended_tools`
- `recommended_taskitem_constraints`
## Baseline Audit Artifact
- `logs/taskitem_runs/TEST_ONLY_sprint236_semantic_fallback_audit_20260226/semantic_fallback_summary.json`
- `logs/taskitem_runs/TEST_ONLY_sprint236_semantic_fallback_audit_20260226/semantic_fallback_tooling_recommendations.json`
Observed in this slice:
- `record_count=5`
- `fallback_rate=1.0`
- dominant root cause: `native_decomposition_and_semantic_signal_deficit`
## Explicit Completion Signal
- Sprint 236: `DONE` (implemented + audit generated + dated metadata captured)

View File

@@ -0,0 +1,26 @@
# Sprint 237 Execution Tracker - 2026-02-26
## Scope
- `sprint237_plan.md`
## Implemented
- Added gate checker:
- `tools/mcp/check_semantic_fallback_budget.py`
- Added wrapper for audit+gate:
- `tools/mcp/run_semantic_fallback_budget_gate.sh`
- Added policy controls:
- `WSTONE_SEMANTIC_MAX_FALLBACK_RATE` (default `0.35`)
- `WSTONE_SEMANTIC_FALLBACK_MIN_RECORDS` (default `5`)
- `WSTONE_SEMANTIC_FALLBACK_INCLUDE_GLOB` (run selection)
## Baseline Gate Artifacts
- expected fail (strict budget):
- `logs/taskitem_runs/TEST_ONLY_sprint237_semantic_fallback_gate_fail_20260226/semantic_fallback_budget_gate.json`
- expected pass (relaxed budget):
- `logs/taskitem_runs/TEST_ONLY_sprint237_semantic_fallback_gate_pass_20260226/semantic_fallback_budget_gate.json`
## Explicit Completion Signal
- Sprint 237: `DONE` (implemented + pass/fail gate smoke verified)