WIP: stage all uncommitted work — sprints 46-221, graduation headers, specialist fleet, test steps 909-1988

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
Bill
2026-04-22 10:15:48 -06:00
parent 486940cbe4
commit 72ffee68fa
2179 changed files with 82979 additions and 1150 deletions

29
sprint211_plan.md Normal file
View File

@@ -0,0 +1,29 @@
# Sprint 211 Plan: Intent-vs-Closeout Consistency Gate
## Context
Execution closeout can pass while original sprint intent remains partially implemented.
## Goals
1. Add explicit intent-coverage scoring per sprint
2. Require intent evidence links per closeout check
3. Block closeout when intent coverage is below threshold
## Steps
### Step 2094: Intent-to-check traceability model (10 tests)
Map sprint goals/steps to concrete implementation and test evidence.
### Step 2095: Intent coverage scorer (10 tests)
Compute per-sprint intent coverage percentage.
### Step 2096: Closeout consistency gate (8 tests)
Fail closeout when coverage threshold is not met.
### Step 2097: Intent drift diagnostics export (8 tests)
Emit unimplemented intent items with evidence gaps.
### Step 2098: Sprint 211 Integration Summary (8 tests)
Add `editor/src/Sprint211IntegrationSummary.h`.
## Architecture Gate
- `EXECUTION-READY` status requires both gate pass and intent coverage threshold pass.