WIP: stage all uncommitted work — sprints 46-221, graduation headers, specialist fleet, test steps 909-1988
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
29
sprint211_plan.md
Normal file
29
sprint211_plan.md
Normal file
@@ -0,0 +1,29 @@
|
||||
# Sprint 211 Plan: Intent-vs-Closeout Consistency Gate
|
||||
|
||||
## Context
|
||||
Execution closeout can pass while original sprint intent remains partially implemented.
|
||||
|
||||
## Goals
|
||||
1. Add explicit intent-coverage scoring per sprint
|
||||
2. Require intent evidence links per closeout check
|
||||
3. Block closeout when intent coverage is below threshold
|
||||
|
||||
## Steps
|
||||
|
||||
### Step 2094: Intent-to-check traceability model (10 tests)
|
||||
Map sprint goals/steps to concrete implementation and test evidence.
|
||||
|
||||
### Step 2095: Intent coverage scorer (10 tests)
|
||||
Compute per-sprint intent coverage percentage.
|
||||
|
||||
### Step 2096: Closeout consistency gate (8 tests)
|
||||
Fail closeout when coverage threshold is not met.
|
||||
|
||||
### Step 2097: Intent drift diagnostics export (8 tests)
|
||||
Emit unimplemented intent items with evidence gaps.
|
||||
|
||||
### Step 2098: Sprint 211 Integration Summary (8 tests)
|
||||
Add `editor/src/Sprint211IntegrationSummary.h`.
|
||||
|
||||
## Architecture Gate
|
||||
- `EXECUTION-READY` status requires both gate pass and intent coverage threshold pass.
|
||||
Reference in New Issue
Block a user