# Sprint 211 Plan: Intent-vs-Closeout Consistency Gate
## Context
Execution closeout can pass while original sprint intent remains partially implemented.
## Goals
1. Add explicit intent-coverage scoring per sprint
2. Require intent evidence links per closeout check
3. Block closeout when intent coverage is below threshold
## Steps
### Step 2094: Intent-to-check traceability model (10 tests)
Map sprint goals/steps to concrete implementation and test evidence.
### Step 2095: Intent coverage scorer (10 tests)
Compute per-sprint intent coverage percentage.
### Step 2096: Closeout consistency gate (8 tests)
Fail closeout when coverage threshold is not met.
### Step 2097: Intent drift diagnostics export (8 tests)
Emit unimplemented intent items with evidence gaps.
### Step 2098: Sprint 211 Integration Summary (8 tests)
Add `editor/src/Sprint211IntegrationSummary.h`.
## Architecture Gate
- `EXECUTION-READY` status requires both gate pass and intent coverage threshold pass.